For many families with secondary decoration or partial decoration, some building materials and products need to be removed during the decoration process, and the surrounding areas need to be protected to prevent damage. Some materials that can be reused after being removed also need to be protected to avoid unnecessary waste. Carry out "protective decoration" during construction and wear a "safety helmet" for reusable projects

for many families with secondary decoration or partial decoration, some building materials and products need to be removed during the decoration process, and the surrounding areas of the removed parts need to be protected to prevent damage. Some materials that can be reused after being removed also need to be protected to avoid unnecessary waste. During construction “ Protective decoration ”, Wear a top for reusable projects “ Safety helmet &rdquo

Qingshan decoration Bingyuan decoration

finished products must be protected during secondary decoration and partial decoration. Experts said that protective decoration is mainly important for the following types of decoration: the first is when consumers are not satisfied with the fine decoration of the house and want to make changes to some parts. For example, if you need to change the wall tiles, wall colors, local doors and windows, etc. in the bathroom, you need to protect the finished products except for the demolition. The second type is the house that has lived for twoorthree years. The wooden door and cabinet are very good. If you only want to change the wall and change a sanitary ware, it also involves the protection of finished products. The third kind is that when the old house is decorated as a whole, there are some places in the home that do not need to be demolished and eliminated, but can still be reused, such as radiators, air conditioners, local floor tiles, etc., which also need to be protected locally

how to carry out protective decoration? Experts suggest that valuables that can be moved, such as household appliances and high-end furniture, should be evacuated from the construction site and transferred to a safer place as far as possible. If only partial decoration is carried out, the non decoration part should be covered with professional protective film for protection. The protective film is provided by professional decoration companies, with different thickness and soft and hard texture. It is recommended to combine soft protection with hard protection. For example, when decorating the bathroom locally, you should enclose the sofa in the living room with soft cloth and then cover it with protective film; The composite floor that needs to be protected needs to be covered with protective film, while the more expensive solid wood floor should be covered with a layer of hard gypsum board or cement pressure board after being covered with protective film

■ protection part

furniture protection

soft cloth, protective film coverage

if you want to re lay the floor, you must remove all the furniture from the construction site. Furniture placed in the construction space shall be covered with professional protective film. For high-end furniture, consumers can first use soft cloth, plastic film and other materials to deal with it by themselves, and then cover it with professional protective film to achieve double protection

radiator protection

handled by professionals

radiators have a long service life and a high probability of reuse. Therefore, when decorating, it can be removed first, and then hung again after the construction is completed. It should be noted that the removal and installation of radiators must be done by professionals to avoid collisions caused by construction tools

pipeline protection

drilling away from the line

pipelines buried in the wall or under the ground are concealed works, which are difficult to protect. Therefore, it should be carried out according to the original construction drawings. If there is no construction drawing, it should be far away from the expected line when chiseling the wall. For example, when laying solid wood floors and laying keels, attention should be paid to avoid bolts, steel nails and other damage to underground pipelines; When removing or installing sanitary ware, attention should also be paid not to damage the original waterway

lamp protection

do not turn on the lamp for a long time after coating

for houses with secondary decoration, many lamps, especially chandeliers, do not need to be eliminated, and most high-end lamps are difficult to clean up once they are stained. At this time, the protective film should also be covered on the lamps. After the lamp is covered with protective film, it should be avoided to turn on the lamp for a long time, otherwise the accumulated heat may cause safety accidents. In addition, the switch panel on the wall and the electronic communication equipment at the entrance door should also be protected

protection of walls, doors and windows

avoid collision

the tiles and coatings on the wall do not need special protection. Without demolition, it is only necessary to avoid collision during construction. It is convenient to wipe the dirt on the wall tiles, and the dust on the wall coating can also be dusted off. Doors and windows need to be covered with protective film together with window frame and door pocket at the construction site to avoid damage

■ removal reminder

wall tile removal

avoid damaging the line

when removing wall tiles, attention should be paid not to use tools such as large impact drills or sledgehammers. Before demolition, it is necessary to find out the laying of pipelines in the original wall and whether the wall is a load-bearing wall, so as to avoid damaging the buried lines or damaging the adjacent wall of the light wall when removing bricks. In addition, the difficulty of removing wall tiles is also different. Some tiles pasted loosely can be removed by just pulling, while some tiles are very firm. It is recommended to use small flat drills

floor removal

start from the corner

the removal process of composite wood floor is relatively simple. Use a flat screwdriver to pry the skirting line, and then pry and remove the floor at the corner along the edge of the skirting line. This floor may be damaged, but other floors can be completely removed. Composite wood floor with lock structure should be pulled out according to the long side of the floor

when removing the solid wood floor, first remove the skirting line, and then use the nail hammer to pry the wood floor out from the corner. As the solid wood floor is installed on the wooden keel, it will have a certain elasticity when prizing, which makes the construction difficult, but the cutting machine cannot be used, because the cutting machine is easy to damage the ground and the expansion bolts that fix the wooden keel and produce sparks

wall demolition

from top to bottom

more and more design schemes involve the demolition of walls. Although consumers understand that load-bearing walls cannot be demolished, they still have doubts about the demolition of non load-bearing walls. Experts explained that most non bearing walls are made of light bricks, while old houses before the 1980s were basically built with red machine bricks. When demolishing, it must be demolished from top to bottom, layer by layer and piece by piece. Avoid hitting with a sledgehammer to prevent injury to human body and stair floor. When it comes to the wall of buried lines, the routing path should be determined first to avoid damaging the reusable pipelines

remove the cabinet and sanitary ware

first remove the connectors

when removing the cabinet, first remove the connectors between the cabinet and the wall, such as screws, bayonets, etc., and then the cabinet can be removed. After cutting off water and power, remove the stove and sink, and the table top is also easy to take down. In addition to removing the connectors of the sanitary ware, the sealant between the sanitary ware and the wall or ground should also be removed with a file to facilitate the smooth removal of the original sanitary ware

■ tips

protective decoration has “ Protection fee &rdquo

the protection work of decoration should be planned before construction, and the space and objects to be protected should be determined according to the content to be demolished. Generally, home decoration companies charge a certain fee for the protection of finished products. The billing method is either according to the number of square meters or according to the number of protected objects. Consumers had better consult in detail and make a budget before decoration